Update from the Woods
Here is a general update on the Woods from Jim:
- Village Staining
This project has been going very smooth and on budget. Happy Valley will be finishing VC # 5 on 8-19-05 and will begin VC # 6 next week. This puts us at the half way point for this project and the outlook for finishing this season is very good. - Village Siding
Siding repairs are complete - Village Chimney
The rebuiding part of the project was finished. We are now waiting for the installation of the new metal caps, which is set to begin on 8-18 & 8-19. - Cluster Door Painting
This project will start in 2 weeks, which is good as most summer renters leave around this time. - Cluster Entrance Light Poles
This project is complete. We installed a new post with cap, new sign, three light fixtures per pole and an outlet. At the base of the pole we built a 2 ft. high stone wall that is 5 ft. in diameter and filled with topsoil. Next year we will plant flowers similar to what is on the bridge. - Cluster Power Washing
One building at E cluster still remains (E-1/E-2) to be done and all of D cluster needs to be done. Everything else is finished. Project should be done by the end of this week - Fire Ponds
B Pond i almost done - only needs some final grading and landscaping. The A Pond digging will begin on 8-18 and will be complete by 8-24. - Step and Rail Repair
We will begin more step and rail repair in the D cluster on 8-19. D has had some washouts that are effecting the stability of the steps. After D we will address the B units. After that we will step in on an as needed basis.