November 28, 2009

Fall Meeting

The Woods Homeowners’ Association

Fall Meeting

November 21, 2009

Recap for May through October of 2009

Capital Projects

Cluster Units

  • Completed Sto (stucco) siding repairs and painted the white stucco in C, D, and G Clusters 
  • Painted grey siding on D Cluster
  • Painted front and rear decks on B through G Clusters

Village Units

  • Replaced both living room windows and rebuilt entire rear wall on V-12 
  • Flashed and repaired deck on V-13.  Replaced living room and loft windows on V-13
  • Replaced loft window on V-32

Common

  • Replaced water level probes and repaired electrical connections for three of six water storage tanks
  • Purchased and installed new locking man-ways for 5 underground water tanks

TM

  • Purchased new lounge chairs for outside summer use
  • Replaced cushions for teak lounge chairs on pool deck
  • Purchased and installed 6 new 1,000 gallon underground propane tanks

Operations

Grounds/Maintenance

  • Repaired break in a four inch water main
  • Repaired cracks on one underground water tank
  • Drained A fire pond and cleaned the overflow outlet
  • Removed old construction debris from upper water tank area and circle beyond Woods Homes where water main break occurred
  • Shut down and super sanitized hot tub due to bacteria reading on water fall
  • Changed batteries in all smoke detectors
  • Inspected and re-charged fire extinguishers in all units
  • Added additional perennials to the grounds
  • Pressure washed all decks and cement patios
  • Fulfilled over 100 in-unit service requests

TM Maintenance

  • Replaced all hot tub and pool drain covers to comply with recent federal law
  • Completed minor upgrades to the fire alarm system as required by the state
  • Replaced electronic igniter on hot tub heater
  • Replaced belt on compressor for pool “Zephyr” temperature and humidity control unit
  • Replaced ladder for hot tub
  • Replaced power module for TM phone voice mail system

Spa

  • Upgraded Spa software
  • Replaced Spa PC

Vendor Services

  • Coordinated over 70 independent contractor services for owners not including providing keys to house cleaners, furniture deliveries and carpet installations
    • 45 propane burner cleanings
    • 11 plumbing repairs
    • Gas range installations
    • Interior painting
  • Purchased and installed new fireplace doors for seven owners
  • Purchased and installed new fireplace screens for 3 owners
  • Located and purchased original replacement window screens and storm window for 2 owners

General Updates

Water System Source Protection Plan

  • An updated Water System Source Protection Plan was submitted and approved by the state.

Shuttle

  • Gramps Shuttle has been contracted to provide winter shuttle service to and from Killington.  Schedules are available and will also be delivered to each unit.  Service is similar to previous years.

Firewood

  • 20 cords of kiln dried fire wood have been purchased for this season

Propane Pricing

  • TM pricing is locked in at $1.244 per gallon for 25,000 gallons with Irving propane
  • Unit pricing will float at fifty cents above Amerigas’s cost

Restaurant

  • We do not have an operator for the restaurant at this time and do not expect to have one for this winter.

Recycling

  • We have arranged for a co-mingled “single stream” recycling dumpster for The Woods and we are investigating purchasing 14 cubic foot “curb” bins for each unit.  If we achieve a significant level of recycling we can lower our monthly refuse cost

Kohl/Madowitz Lawsuit

  • Oral argument for our interlocutory appeal was heard on November 3.  We are now waiting for a decision from the Vermont Supreme Court.  
  • A brief history and background regarding this litigation was prepared by The Woods attorney last April and mailed to all Woods Owners in May of 2009.  If you need a copy, one can be obtained through the Woods Homeowners Association administrative office.

Future Projects to Consider for the Short and Long Term

Cluster Siding

$75,000 to $100,000 - continue with year three of a three year project to repair and paint the exterior siding throughout the Cluster units.  Siding repairs and painting the stucco in A and D clusters remains to complete the project.

Village Roofs

We have three estimates to re-roof the Village units with architectural asphalt shingles.

  • $305,782 - Schernecker Property Services, Waltham MA, received in fall of 2008
    • Price increases 10% if all building not done at one time
    • Does not include repair of stucco siding after flashing is installed
    • Does not include new metal roofs over entryways
  • $385,316 – Allroof, Roofing Specialists, Rutland VT, received fall of 2009
    • Includes stucco repair
    • Includes new metal roofs over entryways
    • Must do at least 3 buildings at a time to receive pricing on materials
  • $126,315 – Bear Mtn. Builders, Rutland, VT, received spring of 2009
    • Proposal lacks some detail

Village Concrete Patios

Replace Village ground level concrete patios and correct drainage as needed.

Village Buildings 1 and 2

Paint the grey cedar siding – this could be done in house at minimal cost (estimate $2,500 - $3,000 per building for one coat of paint and labor)  but should wait if  roofs are to be replaced.  These were not done when buildings 3 through 9 were painted because they had been painted several years before by Woods maintenance.

Village Windows and Sliders

Continue with the replacement of windows and sliders as needed.

TM HVAC

Continue to seek viable economic alternatives for replacement to the TM HVAC systems.

TM Siding

Repair the Sto (stucco )siding on the TM – estimated cost

Paving

  • $62,000 - Woods Road from the fork above the TM to E cluster
    • Excavate existing road bed down 18 inches, add fabric, 18inches of fresh gravel, 2 ½ inch base coat of pavement and 1 ½ inch top coat.
  • $30,000 – add top coat to main road from entry to the TM
  • Village Circle – grind and relay the existing asphalt and repave using the grind as a base
  • E and F parking lots - excavate to remove boulders, repair the base and pave
  • G Cluster and the Homes – upgrade the gravel base and add two layers of pavement
  • Maintenance Road - Excavate existing road bed down 18 inches, add fabric, 18inches of fresh gravel, 2 ½ inch base coat of pavement and 1 ½ inch top coat.

Water System

Replace the two of our six 10,000 gallon water storage tanks that have had to be repaired.  Estimated cost $40,000 - $50,000.

Walkway Lighting

The wiring and posts for much of the exterior walkway lights are in poor condition and need replacing

Replace the drains and overflows on the fire ponds.

The drains are galvanized metal culvert which is now 20 years old and rusting out.

Landscaping

Continue to improve the grounds and add some shrubbery and perennials to areas with limited landscaping.  This should be an ongoing project with improvements made each year out of the operating budget.   Little to no landscaping was done around E, F, and G Clusters and the Village units could use some landscaping around many of the entries.  

Roadway Lighting

Add roadway lighting on the main road.  This has been a known need from the owner surveys sent out.  The issue is that there is not a power source along the road side to use for lighting therefore the project is more involved than simply adding more light poles.

Salt, Sand, and Firewood Storage

This is a request from the grounds crew.  Proper storage would keep firewood drier, allow bulk purchase of salt for winter use, and prevent any environmental issues with sand and salt storage.

Powered by Qumana

Posted by tony at November 28, 2009 11:07 AM

Trackback Pings

TrackBack URL for this entry:
http://www.woodsresort.net/mt/mt-tb.cgi/36

Listed below are links to weblogs that reference Fall Meeting:

» credit repair vt from credit repair vt
a place where different opinions can be expressed. [Read More]

Tracked on December 18, 2009 09:45 PM

» credit fix from credit fix
Lots of different ideas listed here - astounding [Read More]

Tracked on February 11, 2010 07:11 AM

» fix credit from fix credit
I will have to tell my girlfriends about this website! [Read More]

Tracked on February 11, 2010 07:20 AM

» credit repair from credit repair
I will have to tell my buddies about this website! [Read More]

Tracked on February 11, 2010 10:12 AM

» how to fix your credit from how to fix your credit
I will have to tell my buddies about this website! [Read More]

Tracked on February 11, 2010 10:21 AM

» credit repair from credit repair
I am going to put this website to my diggs! [Read More]

Tracked on February 12, 2010 01:29 AM

» Cheap xanax. from Xanax withdrawl.
Xanax xr. Buy xanax. Xanax. Buy xanax without prescription in usa. [Read More]

Tracked on March 18, 2010 12:28 AM

» Generic fioricet. from Fioricet.
Fioricet. Buy fioricet. Order fioricet online. Cheap fioricet. [Read More]

Tracked on March 18, 2010 08:32 PM

Comments